MV Mirach Nagercoil

Project type

Salvage

Date

March 2011

Location

Southern India

Strategic Alliance

Smit Salvage

Bulk carrier "Mirach" (27,192 DWT) grounded on a reef off the coast of Southern India in late March 2011. The grounding position was just three miles offshore off the port of Trivandrum. This is a rocky location and a salvage inspection revealed that most holds and the forepeak were flooded, with the bulkheads later collapsing. The No. 5 hold and the engine room were however still dry. The SMIT salvage team promptly set to work on the first priority the recovery of pollutants, including HFO. This task required the use of a hot tap system, to penetrate and pump from submerged tanks.

A salvage team and equipment were mobilized. In addition, the 'Smit Nicobar' was mobilized from the Arabian Gulf, to act as the main work platform. The main objective was to remove pollutants before the Monsoon break. A total of 32 tonnes were recovered.

Get in Touch

Vishwakarma Marine Pvt. Ltd.

Kala Bhavan, Sudama Road

Porbandar - 360575 (INDIA)

+91 286 2242 836

  • Twitter
  • LinkedIn

Thanks for submitting!

2023 © Vishwakarma Marine Pvt Ltd.

Cookie Policy

Disclaimer

Privacy Policy

bottom of page